Installation Information

Services

The Installation Process

We construct and test all our residential and commercial lifts here in our factory at Acacia Ridge in Brisbane Queensland. Once our lifts have been built and undergone thorough testing, inspecting and quality control, they are loaded and packed ready for install.

The installation process consists of four steps:

1) Site Inspection:
A site inspection will be completed by the installation team if needed to assess the access to site.

2) Initial Install:
The initial install of the lift can take around 2-3 days depending on the type of install.

3) Practical completion:
Including install machine cabinet, complete wiring for lift and machine cabinet, testing of the lift while onsite and any other follow up works needing to be completed

4) Handover:
Handover includes a thorough cleaning of the lift and demonstration of the emergency features and instructions on how to use the lift.

HAVE A QUESTIONS?

Get a Free Consultation Easy as 1, 2, 3

At Aussie Lifts we provide home lifts and small commercial elevators as a means for everyday Australians with limited mobility or a wheelchair disability to live independently both within their home and in the community thanks to our high-quality home elevators.

Send your details and we’ll get back to you